Project Description:
ReArch Company worked closely with Keurig Green Mountain Data Center and Joseph Architects to transform approximately 12,000 SF of existing office space within 30 Community Drive into a Tier III+ data center. The data center features a 2MW facility with dual feeds from a 2.5 MWVA substation adjacent to property and a dual 4000 amp ATS with a 2.5 MW generator installed. Infrastructure is available within the space to support a future installation of an additional 2.5 MW generator and additional chillers for Tier IV, full redundancy. The current cooling capacity includes (2) 100 ton Carrier units, as well as APC chilled water row cooling cabinets.
Project Details
South Burlington, VT 05403 Owner:Technology Park Partners, LLC Architect/Engineer:
Joseph Architects
Project Attributes:
Design-BuildKeurig Green Mountain Data Center is located at Technology Park, a 177-acre premiere business park in South Burlington, Vermont.Visit the Technology Park website to learn more about currently available office space, or build-to-suit opportunities.
Visit technologyparkvt.com »